Boat Care & Maintenance
Beetle Cat Construction
The keel and stem are constructed from air-dried white oak. The steam-bent frames are also of white oak, but cut from the butt of the tree to insure strength and fair bending. Hull planking is white cedar, properly air-dried. All fasteners are silicon bronze screws. Special care is given to the jointing and planking. All loose knots are reamed and plugged. Before plugs are driven they are dipped in glue to insure holding power. Each boat is caulked, faired, and sanded by hand. After each boat comes off the mould, it is given a coat of primer inside and out.
The deck beams are of clear pine sawn to the proper crown. Decking is of cedar, same as the hull. The mast step is of oak and is bridged over the stem and keel and through-bolted through each giving added support to stem and keel. The mast partner is also of oak. Added support is given by using a 2 x 3 strong back which runs fore and aft. It runs along the top of the centerboard box and is fastened to an extra heavy deck beam that helps support the mast partner. The deck beams rest on top of the strong back and are fastened to the sheer clamps. This construction gives a solid deck to walk or jump on. The one-half inch cedar decking is fastened to the deck beams and the top of the sheer plank. It too is plugged, faired, sanded, and then covered with No. 8 canvas duck. The canvas is not set in paint or other bedding as it would be damaged by the shrinking and swelling of the deck planks. Instead, the canvas is given a penetrating primer coat and another top coat.
Coamings are of clear, book-matched oak, steam-bent into place. They are scraped, sanded and varnished. The half?round rub rail is of the same and varnished. Spars are made of air-dried, straight-grain Douglas Fir. Gaff jaws of good dry oak. The mast is tennoned and bears on top of the mast step, preventing the mast from bearing on the stem / keel joint.
The stem is now laminated, producing a much more fair and exact shape (originally it was steam bent). Limber holes of good space have been allowed on all frames. A special mold has been built to insure fair lines and exact dimensions on every boat. Stem to keel fastenings have been bolted and nailed. Centerboard box sides and transoms use a splined glue-joint to ensure tightness. Full length floor boards are now removable for improved maintenance.
Storage
Storage under cover in an unheated garage, barn, or shed, with the boat right-side-up is best. Put two blocks under the keel, one eighteen inches forward of the centerboard slot and the other about eighteen inches forward of the stern along the skeg. To keep the boat upright (level side-to-side), put a chock under each side of the boat at the widest part of the boat and touching on the turn of the bilge.
If the boat must be left outside, keep it in the shade and avoid putting it on blacktop. Cover with a "breathable" tarpaulin or a simple roof. Do not allow the cover to lay directly anywhere on the canvas deck.
A Beetle Cat may be stored on a trailer provided the trailer properly supports the hull.
The older, non-plywood centerboards will stay straighter if left in position in the boat for the winter. Plywood centerboards and rudders should be stored in a standing position so the air reaches them from each side.
Spars should be placed on racks or blocking on the floor so as to be supported in two or three places. It is best if the sun does not beat directly on them.
Spring Commissioning
General
Topsides
Bottom
Deck
Cockpit
Bilge
Briqhtwork and Spars
Rigging
Running rigging should be checked each Spring and replaced if worn or frayed. The following dimension may be helpful:
40 Feet
46 Feet
62 Feet
46 Feet
42 Inches